Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Apr 14, 2022     33-9 Baggage Area step 1-9 - (3.5 hours) Category: Fuselage
Matchdrilled #30 from the right side panel F-1080 into the floor panels and into the longerons. Matchdrilled the #19 holes from F-1080 side panel into the F-1006 bulkhead.
Final drilled all #40 nutplates holes in the F-1034C-R bulkhead.
FInal drilled #19 into the Corrugated panel and F-1006 Bulkhead.
Removed all the panels. Deburred all the holes in the panels.
Drilled the #40 holes for the nutplates to be installed on the bulkhead. AVOIDED to drill the holes on the left side baggage door channel (will do AFTER riveting.
Deburred all the holes.
Dimpled the #40 nut plate attachment holes for AN426D rivets in the bulkhead.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.